Dengyun Ecological Park Landscape Planning

Fuzhou City

The site is within a mountain valley and extends as a ‘green finger’ to touch the innermost part of Fuzhou city. The entire site is the immediate watershed of the Dengyun Reservoir, which sits just below the planning site area. The site was previously developed as a golf course however at the time of BAM’s site visits the golf course had been completely overgrown.

The developer was granted permission to construct residential plots within the planning zone and invited BAM to create an ecologically focused landscape planning design to lead the development process. BAM’s design work built up from the existing and historical watercourses within the site, the continuity of which had been partially destroyed with the construction of a massive swathe of buried utilities constructed by the city. BAM’s watershed rehabilitation strategy formed the framework of the planning effort and creates a landscape water network which will become the highlight of the central park area.

The planning integrates survey information from 3D site scans and in-person site visits to preserve and protect all mature trees and cultural relics within the zone, including an 800 year old stone bridge. At the same time BAM develops the grading plan of the central park to absorb all the soil removed for the government utility swathe and all to be removed from the residential architectural excavations. As a last step BAM developed a material and planting strategy in line with the client’s budget requirements.

The client invited BAM to continue the design process by developing the central ecological park zone of the central park through construction.

登云生态公园景观规划

福建

项目位于福州东北部的金鸡山山谷中,被称为“绿手指”的山脊延伸至福州市区中心。项目紧挨登云水库分水岭,水库位于其下方。项目所在地曾是一块高尔夫球场,但在BAM进行实地考察时,球场已经荒废且杂草丛生。

阳光城开发商获批在规划区内建造住宅,并邀请BAM规划一个以生态为核心的景观设计,以此主导整个场地的开发进程。BAM的景观设计依托场地现存及历史水系,发现该地水系的流通性在此前市政公用设施建设中被破坏。因此,BAM的规划工作以水系修复为主轴,打造景观水系网络,未来这将成为中央公园区域的亮点。

设计规划整合了实景3D扫描和实地考察中所获得的信息,对区域内所有的大型乔木和历史文物采取保护措施,其中包括一座具有800年历史的石桥。与此同时,BAM制定了中央公园的分级建设计划,这有利于将政府公用设施建设以及未来住宅建设中挖出土方的再次利用。最后,BAM制定了符合客户预算要求的材料清单和植物规划。

其后,客户还邀请BAM在中央公园的开发过程中继续生态公园的设计。